Maximize Grid Utilization
Get more value from the distribution system customers have already paid for by bringing circuits closer to their rated capacity.
Switched Source’s distribution automation devices balance load across phases using power electronics, so more of each circuit’s rated capacity is usable at peak, at a fraction of the cost of building new capacity.
Use the Capacity You've Already Paid For
Every distribution circuit has a rated capacity: the load its conductors and equipment are built, and paid for, to carry. Its operational capacity, what it can actually serve before hitting a limit, can sit well below that rating.
Phase imbalance is a large part of the gap. When one phase reaches its limit first, the whole circuit is treated as full, even though the other two phases still have room. Dynamic loads widen the gap: EV charging, heat pumps, and rooftop solar shift load between phases through the day, so the limiting phase can change from one hour to the next.
As load grows, the default answer is to build more, adding to rates while existing assets stay underused. Closing the gap between rated and operational capacity first means new investment goes where it is genuinely needed.
Call us when...
A rate case needs evidence that existing assets are fully used before new spending is approved.
Affordability goals are putting pressure on the capital plan.
Distribution plans don’t yet measure how fully existing assets are used.
What You Unlock Over Traditional Solutions
Traditional planning answers a full circuit by building. A utilization-first approach starts at the bottom of the capacity ladder, where options cost the least, and climbs toward new construction only when it is needed.
Switched Source technology sits on the advanced power-flow control rung, raising what existing circuits can serve at a fraction of the cost of new capacity and in months rather than years, so capital goes to the circuits that need it most.
How Many Circuits Could Benefit
RESEARCH · CIRCUIT SCREENING
Phase imbalance shows up across the grid, but most often in rural areas, where long single-phase laterals are common. Screening estimates range from about 20% of urban circuits to as many as 45% of rural circuits, roughly 70,000 circuits across the United States in total.
In a study published with CIGRE, a large Northeast utility screened 972 circuits and found 19% fit the core use case for dynamic phase balancing. An analysis in an EPRI Incubatenergy Labs report found a 44% hit rate at a Midwest utility with more rural circuits.